The core answer
Signing a contract online does not remove stamp duty if the contract is an instrument in the stamp duty schedule at the end of the Revenue Code. What changes is how you pay. Some electronic instruments are paid in cash through the Revenue Department's e-Stamp system, and you receive a receipt and a verification code instead of affixing stamps.
Three things for an SME to remember: check before signing whether the contract is a dutiable instrument; pay before the instrument is made or within 15 days from the day after it is made, according to Revenue Department documents; and keep the receipt and verification code with the contract file, because under section 118 an instrument that is not fully stamped cannot be used as evidence in a civil case until it is put right.
This guide differs from Signing Company Contracts Online: What Evidence Is Needed to Prove Them?, which asks whether an electronic signature is valid and provable. This guide asks whether the valid contract carries stamp duty, and how it is paid. They are separate conditions: a contract with a perfect signature can still be short of duty. Figures labelled "hypothetical example" only illustrate the reasoning.
1. How does an online signature differ from stamp duty?
| Question | Electronic signature | Stamp duty |
|---|---|---|
| What it answers | Is the contract binding and provable? | Is the instrument subject to duty? |
| Who sets the rule | Electronic transactions law | Revenue Code and its stamp duty schedule |
| Result if skipped | Weak evidence, the other side can deny | Surcharge, and no use as civil evidence until fixed |
| Who checks | Court or counterparty | Revenue Department |
Most online signing platforms do not pay the duty for you. Do not assume a contract with a platform signing certificate is already stamped.
Paying in cash instead of affixing stamps works because of section 8, paragraph 2 of the Electronic Transactions Act B.E. 2544 (2001), added by the second amendment of B.E. 2551 (2008). Where a law requires stamp duty to be affixed, and payment or another step is made electronically under the rules and methods announced by the relevant government agency, the instrument is treated as stamped and cancelled under that law. The section does not exempt anything from duty; it only allows payment by the method the Revenue Department sets.
2. Which instruments are subject to stamp duty?
Duty is charged on instruments listed in the schedule, not on every contract. Common business examples:
| Instrument | Business example | Note |
|---|---|---|
| Hire of work (item 4) | Website development, construction, made-to-order production | Supported by e-Stamp |
| Loan or agreed bank overdraft (item 5) | Director lends to the company, inter-company loan | Supported by e-Stamp |
| Power of attorney (item 7) | Authority to register or deal with agencies | Supported by e-Stamp |
| Proxy to vote at a company meeting (item 8) | Shareholder appoints someone to attend | Supported by e-Stamp |
| Guarantee (item 17) | Director guarantees company debt | Supported by e-Stamp |
| Lease of property | Office or warehouse lease | Check the schedule; duty depends on the term and rent |
| Other scheduled instruments | Check each one | If paid in cash electronically, form Or.Sor.4 at the area Revenue Office, according to the Department's document |
The item numbers and the list e-Stamp supports come from Revenue Department documents at the launch of the system. The Department may add items later, so check the current list and rates on the Revenue Department website, or ask the local Revenue Office, before you sign. This guide gives no rates per instrument because the rate depends on the type, value and exemptions in each case.
A contract not in the schedule, such as an ordinary sale of goods, may carry no duty. But one contract can contain several instruments, for example a sale combined with installation or hire of work. Look at the real content, not just the title.
3. Who must pay stamp duty, and when?
According to Revenue Department documents, the person liable for the duty files the request and pays. For each type of instrument, check the schedule and the Department's guidance. In practice the parties often agree who bears the cost. That agreement does not protect the other party if nobody pays, because an unstamped instrument affects both sides when used as evidence.
Deadline for electronic instruments according to the Department's document:
- Pay before the instrument is made or within 15 days from the day after it is made, counting public holidays.
- If the last day is a public holiday, you may file on the next working day.
- Payment is by electronic transfer to the Revenue Department's bank account.
- The normal system accepts only requests within the deadline. Late or supplementary filings use form Or.Sor.4 or Or.Sor.4 Kho at the area Revenue Office.
The counting date is the date the instrument is made, which in principle is the date the last party signs. Always record the date of the last signature.
4. How do you pay duty through e-Stamp?
Use the e-Filing section of the Revenue Department website, or the Department's API. You generally need an e-Filing user account and the instrument file.
- Confirm the contract is an instrument the system supports and choose the correct instrument type.
- Prepare the electronic instrument with a unique reference number for each copy (the Department describes it as a number or characters generated by the instrument-maker's system to identify that instrument).
- Complete form Or.Sor.9 with the parties, instrument type, value and reference number.
- The system calculates the duty. Check the figure against the contract.
- Transfer the money through the channel the system specifies.
- When the Department issues the verification code with the receipt, the instrument listed in the form is treated as fully stamped.
- Save the receipt and verification code with the contract and record the reference number in the contract or contract register.
Hypothetical example: Company A signs a hire-of-work contract with Company B online on the 3rd of the month. The 3rd is the date the instrument is made, and 15 days from the day after is the 18th of the same month. Finance should aim to file within the first week after signing rather than on the last day, leaving time to fix user-account or transfer problems.
5. How do paper and electronic instruments differ?
| Item | Paper instrument | Electronic instrument |
|---|---|---|
| Form | Signed on paper | Electronic data under the electronic transactions law |
| How duty is paid | Affix stamps and cancel them, or pay in cash by the Department's method | Cash payment through e-Stamp (form Or.Sor.9) for supported instruments |
| Proof of payment | Cancelled stamps or a receipt | Receipt and verification code from the Department, with the reference number |
| Biggest risk | Stamp falls off or is not cancelled | Missing the deadline or choosing the wrong instrument type |
Under the definition in section 103, "fully stamped" means the duty has been paid in a way the law recognises, including cash payment where the law allows it.
6. What if you sign on paper and scan, or sign online and print?
Mixed situations are common. The test is which version is the one actually binding.
| Situation | Binding instrument | What to do |
|---|---|---|
| Both parties sign on paper, then scan for the file | The paper original | Pay duty by the paper-instrument method; the scan is a copy |
| One party signs on paper, the other signs a file | Unclear | Agree in writing which version is the main one; if possible both sign the same way |
| Signed online, then printed for the binder | The electronic file | Pay e-Stamp if the instrument is supported; the printout is a copy |
| Online contract printed and signed again by hand | Possibly two versions | Avoid paying twice or not at all; state in the contract which one is the original |
For an electronic instrument outside e-Stamp (for example one the system does not yet support), the Department's document says to pay in cash with form Or.Sor.4 at the area Revenue Office. If your case does not fit this table, ask the local Revenue Office first.
7. What evidence should you keep?
- The contract file signed by all parties, with each party's signing date
- The electronic instrument's reference number
- Form Or.Sor.9 as filed, or Or.Sor.4 for paper instruments or late filing
- The receipt and payment verification code issued by the Revenue Department
- Proof of the transfer from the company account
- A note of who bears the duty under the contract and whether the other side has reimbursed it
- A contract register with columns for instrument type, date made, payment deadline and receipt number
Good practice (not a legal requirement) is to keep the whole set in one folder for the life of the contract plus the period you need to defend disputes. For retention schedules see How Long Should a Company Keep Contracts, Emails, Chats and Employee Records in Thailand?.
8. What do you do if you later find duty was not paid?
The safer order is to fix it yourself before an officer finds it and before you need the contract in court.
- Check whether the instrument really is dutiable and whether the other party already paid. Ask them for the receipt first.
- Work out how late you are, counting from the date the instrument was made.
- File to pay the duty plus surcharge under section 113, which lets the person liable bring in an insufficiently stamped instrument and pay. According to the information we could check, the surcharge has a band up to 90 days and a higher band beyond 90 days. A late e-Stamp instrument must be filed at the area Revenue Office.
- If an officer finds it, section 114 applies and the Department collects duty with a higher surcharge. According to the information we could check, an instrument not stamped at all can carry a surcharge of six times the duty or 25 baht, whichever is greater.
- Put the new receipt with the contract and record why it was missed.
Hypothetical example: after more than 90 days a company discovers that a hire-of-work contract never had duty paid. It should ask the local Revenue Office how much duty and surcharge are due and pay before submitting the contract as evidence. Do not wait until after the claim is filed, because until then the contract cannot be used as evidence.
Surcharge rates may be amended later, so check the current rates with the Revenue Department before paying. This guide does not promise any reduction or waiver of the surcharge.
9. If duty is not paid, can the contract still be used as evidence in court?
Under section 118, an instrument that is not fully stamped cannot be used, in original, counterpart, torn counterpart or copy, as evidence in a civil case until the duty is paid in full under the schedule. The section does not remove the Department's right to the surcharge under sections 113 and 114.
What to understand correctly:
- It does not make the contract void. It is a question of admissibility of evidence.
- The scope is civil cases, not every proceeding. If you may rely on the contract in another kind of case or in arbitration, consult a lawyer.
- It can be cured by paying the full duty before you tender the document, so check before filing a claim or sending a demand letter that relies on the contract.
- It applies to every document that proves a right under the contract, such as the power of attorney or guarantee you need to sue a guarantor.
If you are about to collect a debt or enforce a contract, check the stamp duty status before the first demand letter goes out.
10. How should the company organise the process internally?
| Step | Owner | Action |
|---|---|---|
| Before signing | Contract reviewer | Identify which scheduled instrument it is; state in the contract who bears the duty |
| Signing day | Contract coordinator | Record the date the last party signs and set the payment reminder |
| Within 3-5 days after signing | Accounting and finance | File and pay the duty |
| After payment | Document keeper | Store the receipt, verification code and reference number in the contract file |
| Every quarter | Management or accounting | Go through the register for contracts with no duty receipt |
The "before signing" step belongs in the company's existing contract review process; see Contract Review Before Signing When You Have No Legal Department: An Approval Process for Thai SMEs. Accounting should know the duty cost in advance so it is booked in the right period.
11. What should you check before and after signing online?
- Is the contract in the stamp duty schedule? (Check the real content, not just the title.)
- Does the contract say which party bears the duty?
- Have you confirmed e-Stamp supports this instrument on the signing date?
- Is the original identified when there is both paper and a file?
- Is the date the last party signed recorded, with a reminder before day 15?
- Is the duty paid, with receipt and verification code in hand?
- Is the payment record stored with the contract file?
- Have older contracts in the register been checked for missing duty?
Further reading
- Signing Company Contracts Online: What Evidence Is Needed to Prove Them? — validity of the signature and signing evidence (a different question from duty)
- How Long Should a Company Keep Contracts, Emails, Chats and Employee Records in Thailand? — retention schedule
- Contract Review Before Signing When You Have No Legal Department — approval steps
- Unpaid Invoices from Business Customers — when you need the contract as evidence to collect
Signing online does not waive duty. Check whether the contract is dutiable, pay before the instrument is made or within 15 days, keep the receipt and verification code, and fix any gap immediately, before the contract is needed in court.
We help check whether a contract is a dutiable instrument, prepare contracts and guarantees, and coordinate the correction of missing duty. For an initial consultation, call +66 92 254 2045 or send us the details. See also our contracts and documents and accounting and tax services.
This guide is published by Suwanvara Law Firm — a Khon Kaen law firm established in 1986. General information only, not legal advice on a specific matter.