The core answer
Whether you may hire a subcontractor for some production steps depends on that promotion certificate and that project's conditions. There is no rule that fits every BOI company. The certificate fixes the products or services, the capacity, the location and any business-specific conditions. The BOI Guide 2025 also states that the production or service process must follow what the Board approved. Subcontracting is therefore not only a contract question. It changes how the work was approved to be done.
Three things to check before you sign with a subcontractor: (1) whether the step you want to outsource lies within the promoted activity and approved process, (2) whether duty-exempt machinery would have to be used away from the approved site or by someone else, and (3) whether the subcontract is tied to what the certificate actually says, for example the location, the output, the records to keep, and a way out if BOI disagrees.
If the change touches anything stated on the certificate, raise it with the Thailand Board of Investment (BOI) before you start, not after. Information as at 21 November 2026. Always check BOI's latest announcements before deciding.
Who this is for
| Your situation | Where to focus |
|---|---|
| You have just received the certificate and are designing the production line and choosing subcontractors | Sections 1 to 4, then draft the contract using section 6 |
| Your project is running and a subcontractor already does some work | Sections 4, 5, 6 and 8 |
| You are about to change something, such as moving a step to a subcontractor or sending machinery to another factory | Sections 3, 4 and 7, and the checklist |
This guide builds on the guide to conditions after receiving a BOI certificate, which covers deadlines, reports and what revocation means in general. Labour issues around contractors (wages, social security, liability to workers) are in our guide to outsourced labour and subcontracted workers. This guide deals only with the promotion-certificate angle.
1. What should I look at on the certificate before talking to a subcontractor?
Read the certificate and all attached documents, including the approval letter and every amendment. Do not rely on what sales or the plant remember. A project that has run for years often carries amendments that newer staff do not know about.
| Item on the certificate | Question when you consider subcontracting |
|---|---|
| Activity type, products or services, and capacity | Would the subcontracted work make actual products or capacity differ from what was approved? |
| Production process | Is the step you want to send out part of the process described? |
| Project location | Would the work be done at another factory, not the site on the certificate? |
| Machinery with duty exemption or reduction | Which machine would be moved or made available to others? |
| Specific conditions (for example a standard such as ISO, depending on the activity) | Does the subcontractor make that condition harder to meet or prove? |
| Shareholding proportion, and approved foreign workers or specialists | Does the change affect the staffing plan you filed? |
| Deadlines and required reports | Will the subcontractor's data be available for your reports? |
If you do not hold a full set of documents, you can ask BOI for copies before starting contract talks.
2. Is the work I want to subcontract within the promoted activity?
BOI privileges attach to the activity described on the certificate, not to the company as a whole. What BOI considered when it issued the certificate was a company making the product itself by the approved process. When some steps go to another party, think in three groups.
- Core steps of the activity. Steps that create the value or are the heart of the approved process. Subcontracting these carries the highest risk. Raise it with BOI in every case.
- Auxiliary steps. Packing, plating or spray painting, printing, internal transport. Many projects already use outside contractors for these, but do not assume your certificate allows it. Check the process as described.
- Work outside the promoted activity. For example making other products for other customers on the project's machines. That runs into the question in section 4 about using machinery outside the activity.
In practice BOI looks at each project on its own. That another company in your industry subcontracts is not evidence that your certificate allows it. If your company has both promoted and non-promoted activities, read our guide to BOI and non-BOI activities in one company too.
3. After subcontracting, is the approved production process still the same?
The BOI Guide 2025 sets a general condition that the project must use a modern production or service process, as approved by the Board. So the question is not whether the final product looks the same. It is whether what you actually do still matches what was filed and approved.
Check in this order.
- Draw the process flow as filed with BOI and compare it with the flow after subcontracting.
- Identify which steps move out, where they go, and who owns the raw materials, work in progress and product at each stage.
- Ask whether the product you sell still goes through the project's main process, or whether you have in effect become a buyer of semi-finished or finished goods who resells them.
- If the difference from what was filed is material, prepare a request to amend the project or a consultation letter, with the before and after flow charts.
At least one question should go to BOI: "May step X of project no. ... be done by a subcontractor at ...? Does the certificate or its attachments need to be amended?" Keep the answer in writing.
4. How far can machinery, raw materials and the place of work go to the subcontractor?
This is the most frequent risk in subcontracting, because contract-manufacturing agreements often say "the principal supplies machinery or moulds for the contractor's use", which collides with a statutory prohibition.
| Situation | What to check |
|---|---|
| Sending duty-exempt or duty-reduced machinery to the subcontractor's factory | Section 40 prohibits letting others use it and moving the factory or place of business outside the area stated on the certificate, for a period of not less than 5 and not more than 15 years set by the Board. Permission under section 41 is needed first |
| The subcontractor comes to use machinery at the BOI company's factory | This is letting another party use the machinery. If it received a duty exemption or reduction, ask whether the prohibition applies |
| The subcontractor uses all of its own machinery | The company-machinery prohibition is not engaged, but the process question in section 3 remains |
| Using the project's machinery for contract manufacturing for other customers | Is this use outside the promoted activity? Check section 40 |
| Duty-exempt raw materials for export production, sent to the subcontractor for processing | The section 36 privilege is tied to importing for production, mixing or assembly of export goods. Ask BOI and Customs how onward transfer may be done and on what conditions |
Section 41 gives the Board power to permit mortgaging, selling, transferring, leasing, using for another purpose, or letting others use machinery that received a duty exemption or reduction, or moving the factory or place of business. Permission may be given in writing or by amending the certificate, and conditions may be attached. So the answer is not an absolute no. It is permission first, then action. The exact period and conditions are on your own certificate. Import mechanics and customs steps are in our guide to importing machinery for a new factory. The tax and duty consequences should be checked by a customs specialist and an accountant.
A note on moulds, jigs and control software. If they were duty-exempt together with the machinery, treat them in the same question. Check the approved machinery list rather than guessing from the names.
5. How do location, capacity, tax privileges and reporting come into it?
Location and capacity. If part of the work is produced away from the site on the certificate, ask whether BOI treats that capacity as the project's, and whether the certificate still matches what is produced. A change of location, product or capacity needs an amendment application, as explained in the guide to conditions after receiving a certificate.
Tax privileges. Privileges are tied to the promoted activity. If part of what you sell is made outside the project, ask BOI to confirm whether income from those goods falls within the promoted activity, and have an accountant or auditor check how income and costs are separated and what the tax result is. A law firm does not give tax figures and does not confirm which income is exempt.
Reports and records. Projects report through the e-Monitoring system on the cycle BOI sets. If data such as output volume, raw material use or standards test results sits with the subcontractor, the contract must oblige it to supply that data on time.
Foreign personnel. If the approved staffing plan is tied to positions in your own plant, moving work to a subcontractor may change those positions. See our guide to work permits and visas through BOI.
6. What should the subcontract say so that it fits the certificate?
The points below are practical suggestions, not legal requirements. Adjust them to your certificate and the risk of your project.
| Topic | What to write |
|---|---|
| Scope of work | The step subcontracted, the product specification and the actual place of work. Do not write it so widely that it covers work you never discussed with BOI |
| Ownership | Who owns raw materials, work in progress, moulds and products at every stage |
| Principal's machinery | No moving or use before the principal confirms BOI has permitted it. If permitted, state location, who is responsible, and return |
| Inspection | The principal's right, and that of relevant officials, to inspect the site and documents. Production records kept so they can be traced |
| Reporting data | The subcontractor supplies the data needed for BOI reports by the dates the principal sets |
| Sub-subcontracting | No passing work on to others without written consent |
| Standards and quality | The subcontractor maintains any standard the certificate's conditions require |
| Labour | Liability to the subcontractor's workers. See the guide on outsourced labour |
| Condition precedent | The contract, or parts of it, take effect when BOI replies or approves, where the matter needs permission |
| Change on BOI's direction | The principal may adjust scope or terminate if BOI refuses or adds conditions, and the subcontractor cooperates |
| Confidentiality and IP | Designs, formulas and know-how stay with the principal. The subcontractor uses them only for this work |
A well-drafted contract does not replace permission. Where permission is needed from BOI, the contract only stops one party from carrying the other's risk.
7. What do I raise with or get approved by BOI before changing anything?
The guide on conditions after receiving the certificate explains that changes to registered capital or shareholding, products or services, capacity, location and other conditions on the certificate require an application to amend the project, not a notice afterwards. Subcontracting can touch several of these at once.
| Change you are considering | Starting approach |
|---|---|
| Move duty-exempt machinery to the subcontractor's factory | Seek approval or permission under section 41 before moving |
| Let the subcontractor use the company's machinery | Seek permission first if the machinery received a duty exemption or reduction |
| Move a core step of the process outside the factory on the certificate | Consult BOI and prepare an amendment application with before and after flow charts |
| Subcontract only auxiliary work with no project machinery involved | Check the process on the certificate and ask BOI if unsure. Get the answer in writing |
| Subcontract so much that capacity or the actual product changes | Apply to amend the project |
| Transfer the whole business or merge instead of subcontracting | A different matter. See section 56 of the Act and the guide to buying a BOI company |
A sequence that fits almost every case:
- Gather the certificate, attachments and every earlier approval of amendments.
- Write a short subcontracting plan with before and after flow charts and a list of the machinery involved.
- Contact the BOI officer responsible for the project and ask in writing.
- If an amendment is needed, file it before starting the subcontract, and wait for the result before moving machinery or producing the new way.
- Adjust the contract to the answer, and keep the whole set in the project file for reports or inspections.
BOI may have different guidance or forms by activity and over time. Check the latest announcements at BOI.
8. What if we already subcontracted without asking BOI?
Do not do nothing, and do not write reports as though nothing changed. A sensible order:
- Gather the facts: when it started, which step, where, which machinery is where, and who uses it.
- Stop any further movement or sharing of machinery until you know whether permission is needed.
- Compare with the certificate and attachments and see which row of the table in section 7 applies.
- Speak to your legal adviser before contacting BOI, so that the wording and documents match the facts.
- Contact BOI to apply for an amendment or retrospective permission as BOI directs.
Section 54 gives the Board power to revoke the privileges in whole or in part where a company breaches or fails to comply with conditions, and if the Board finds the breach was not intentional, it may direct the office to send a warning to correct it within a set time first. The real outcome of any case depends on the facts, intent, duration and the Board's discretion. We cannot say in advance what it will be. The effects of revocation are described in the guide to conditions after receiving a certificate.
Hypothetical example: a plastic parts plant that wants to subcontract painting and assembly
This is not a real case. It is a made-up illustration of the reasoning, and all figures are illustrative only.
Company A holds a certificate to make plastic parts at one plant. The process in the attached documents lists injection moulding, spray painting and assembly. In year two orders rise, so the company wants to send 30 percent of the volume of painting and assembly to Company B in another province. Company B asks to borrow Company A's moulds and paint-spraying machine.
What the check shows:
- Painting and assembly are in the process stated on the certificate, so this is not minor ancillary work. Moving them out calls for a discussion with BOI.
- The spray machine received a duty exemption on import. Letting Company B use it and moving it to another province falls under section 40, so permission under section 41 is needed first.
- The volume produced away from the site may affect the capacity shown in reports.
- An alternative is for Company B to use its own machine, but the process question still goes to BOI.
Company A therefore sends BOI a plan with before and after flow charts, makes the contract take effect only when BOI replies, and does not send any machinery until it has an answer. BOI's answer cannot be known in advance, and the company prepares a fallback in case permission is refused.
Checklist before subcontracting or changing how you work
- You have the certificate, attachments, approval letter and every amendment
- You have drawn the process flow as filed and the flow after subcontracting
- You have identified the steps to go out, the volume and the subcontractor's location
- You have checked the list of machinery with duty exemption or reduction and the period set by the Board
- You have checked whether machinery, moulds or raw materials will go to the subcontractor
- You have checked the certificate's specific conditions and the approved staffing plan
- You have sent BOI your question or amendment request in writing and kept the reply
- The contract matches the reply, including a condition precedent and a duty to supply report data
- An accountant or auditor has checked the separation of income and costs and the tax result
- Someone is responsible for keeping the subcontractor's records for e-Monitoring reports
- A reminder is set to check BOI's latest announcements before starting and before renewing the contract
Common misunderstandings
| What people assume | What is correct |
|---|---|
| Subcontracting is a private contract matter and BOI is not involved | The certificate fixes the process, location and machinery. Subcontracting can affect those conditions and must be checked first |
| Another company in our industry subcontracts, so we can | BOI considers each project on its own. Look at our certificate and attachments |
| The machinery belongs to the company, so anyone can use it | If it received a duty exemption or reduction, section 40 prohibits letting others use it during the period set by the Board, unless permitted under section 41 |
| We can ask BOI afterwards if nobody asks | Amendment or permission must come before the change. Acting first and asking later adds risk under section 54 |
| A well-drafted subcontract replaces BOI permission | A contract allocates liability between private parties. It does not make BOI permit anything |
| After subcontracting the goods certainly keep the same tax privileges | It depends on whether BOI treats the work as within the promoted activity, and an accountant should check the tax result |
Further reading
- Conditions after receiving a BOI certificate: deadlines, reports and project amendments
- Buying a BOI-promoted company: due diligence before a share transfer
- Outsourced labour and subcontracted workers: liability and contracts
- BOI and non-BOI activities in one company
- Importing machinery for a new factory
A promotion certificate is the frame of the project: before you move work or machinery to a subcontractor, compare the plan with the certificate and get BOI's answer in writing.
We help read the certificate and its attachments against your subcontracting plan, draft and review contract-manufacturing agreements to fit the project's conditions, and prepare the consultation letter or amendment application sent to BOI. We are not BOI, an accountant or a customs broker, so we do not check tax or duty figures, and we cannot promise that BOI will approve. Our fees depend on the stage of the matter and the work involved. Send us the documents first, and we will give you the scope of work and fees in writing before we start. Call +66 92 254 2045 or send us the details. See also our investment advisory service for BOI and foreign investors and our contract drafting and business documents service.
This guide is published by Suwanvara Law Firm — a Khon Kaen law firm established in 1986. General information only, not legal advice on a specific matter.